A KNOW-HOW IN THE SERVICE OF THE DEVELOPMENT

ALGERIAN COMPANY OF REALIZATION OF INDUSTRIAL PROJECTSJOINT-STOCK COMPANY (50 % SONATRACH AND 50 % ABB-SPA/ITALY) FULLY QUALIFIED TEACHER ISO 9001/2008

Current projects

Boosting HRM PHASE 3 – Lot Sud-

Boosting South Station (SBS)

  • Piping ( Shop fabrication & Field )
  • Mechanical equipments (static & rotatory)
  • Electricity & Instrumentation, Painting, Insulation & Fire proofing
  • Tanks erection – Steel Structure.                                     

Boosting North Station (SBN)

Piping ( Shop fabrication & painting )

  • Customer :

  • Location : Haoud el Hamra
  • Deadlines : 26 mois